Skip to main content
Verga Electric logo
Aerial view of the SESCO Tampa cement terminal at Port Redwing
All projects

Industrial Terminal Infrastructure

SESCO Tampa Cement Terminal

Port Redwing · Gibsonton, Florida

Industrial electrical work supporting a high-capacity cement import and distribution terminal serving Florida and the Southeast.

Project type

Industrial cement terminal

Market

Bulk material handling and distribution

Facility

Marine-access terminal

Location

Port Redwing, Tampa Bay

Project Scope

Electrical infrastructure for terminal operations

Verga Electric performed industrial electrical work supporting the Tampa terminal's material-handling, storage, and distribution infrastructure. The installation required field coordination across large equipment areas and elevated conveyor structures.

  • Industrial power distribution and field installation
  • Equipment and material-handling system connections
  • Conveyor, tower, and operational-area lighting
  • Electrical work across warehouse and terminal environments

Operating Context

Built around a high-throughput distribution operation

The Tampa facility operates as a high-capacity distribution hub with direct marine access, integrated storage infrastructure, an on-site warehouse and packaging operations, truck loading, and six primary storage locations. Verga's work supported the electrical systems serving that broader operating environment.

Field & Finished Work

Project gallery

Select a photo to explore the details.

Planning a project with similar coordination requirements?

Send the scope, project location, timeline, and a link to the plans. Our team will review the opportunity and follow up directly.

Invite Verga to Bid